Masury-Maysville substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-176 | Masury-Maysville 138 kV | 138 | 36 | Solar | Withdrawn |
| AE2-036 | Masury-Maysville 138 kV | 138 | 13.5 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.