Substation Scout

Masury-Maysville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-176 Masury-Maysville 138 kV 138 36 Solar Withdrawn
AE2-036 Masury-Maysville 138 kV 138 13.5 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.