Shenango-McDowell substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-490 Shenango-McDowell 138 kV 138 105 Hybrid Withdrawn
AD2-120 Shenango-McDowell 138kV 138 50.4 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.