Lamberton Road Battery
PJM queue ID AF1-237
Lamberton Road Battery (AF1-237) is listed in the PJM interconnection queue as a 80 MW battery project in Mercer County, NJ. The filing names Mercer as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of August 11, 2028.
| Queue ID | AF1-237 |
|---|---|
| Project name | Lamberton Road Battery |
| Status (as published) | Engineering and Procurement |
| Substation | Mercer |
| Point of interconnection | Mercer 230 kV |
| County | Mercer |
| State | NJ |
| Voltage | 230 kV |
| Capacity | 80 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-08-11 |
| Source dataset | serial |
Same substation and county
Mercer substation: 5 requests in the PJM queue, 2 active totaling 180 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1327 | Mercer 230 kV | 100 | Battery | Active |
| D26 | Mercer 230kV | 550 | Gas | Withdrawn |
| AI2-469 | Mercer 12.5 kV | 5.8 | Solar | Withdrawn |
| AI2-470 | Mercer 12.5 kV | 5.8 | Solar | Withdrawn |
Mercer, NJ: 28 requests in the PJM queue, 8 active totaling 183.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 170 |
| MW capacity | 80 |
| MFO | 170 |