Lamberton Road Battery

PJM queue ID AF1-237

Lamberton Road Battery (AF1-237) is listed in the PJM interconnection queue as a 80 MW battery project in Mercer County, NJ. The filing names Mercer as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of August 11, 2028.

Queue IDAF1-237
Project nameLamberton Road Battery
Status (as published)Engineering and Procurement
SubstationMercer
Point of interconnectionMercer 230 kV
CountyMercer
StateNJ
Voltage230 kV
Capacity80 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-08-11
Source datasetserial

Same substation and county

Mercer substation: 5 requests in the PJM queue, 2 active totaling 180 MW.

Queue IDProjectMWResourceStatus
C01-1327Mercer 230 kV100BatteryActive
D26Mercer 230kV550GasWithdrawn
AI2-469Mercer 12.5 kV5.8SolarWithdrawn
AI2-470Mercer 12.5 kV5.8SolarWithdrawn

Mercer, NJ: 28 requests in the PJM queue, 8 active totaling 183.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy170
MW capacity80
MFO170

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.