Maysville substation interconnection queue
2 active projects totaling 30 MW in the PJM queue, plus 1 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jan 2027 to Aug 2027 (3 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: EKPC (1 filing).
2active projects
30active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-285 | MC Solar | 69 | 30 | Solar | Under Construction | Jan 2027 |
| AI2-467 | Maysville 138 kV | 138 | 5.8 | Solar | Withdrawn | May 2027 |
| C01-1063 | Maysville 25 kV | 25 | 0 | Solar | Active | Aug 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Mercer County, PA
- McDowell: 2 active, 401.9 MW of 7 filed
- Mercer: 2 active, 180 MW of 5 filed
- Wheatland: none active of 3 filed
- Canal: none active of 2 filed
- Hadley: none active of 2 filed
- Masury-Maysville: none active of 2 filed
- Maysville III: none active of 2 filed
- Maysville IV: none active of 2 filed
- Maysville V: none active of 2 filed
- Shenango-McDowell: none active of 2 filed
Other PJM queue substations in Mason County, KY
- North Clark-Spurlock: 1 active, 150 MW of 2 filed
- Stuart: 1 active, 7 MW of 2 filed