Maysville substation interconnection queue

2 active projects totaling 30 MW in the PJM queue, plus 1 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jan 2027 to Aug 2027 (3 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: EKPC (1 filing).

2active projects
30active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-285 MC Solar 69 30 Solar Under Construction Jan 2027
AI2-467 Maysville 138 kV 138 5.8 Solar Withdrawn May 2027
C01-1063 Maysville 25 kV 25 0 Solar Active Aug 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Mercer County, PA

All 57 PJM queue filings in Mercer County, PA.

Other PJM queue substations in Mason County, KY

All 8 PJM queue filings in Mason County, KY.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first