Hadley substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Hadley as the point of interconnection, all in Mercer County, PA.

Target commercial operation dates as filed run from Dec 2022 to Jun 2024 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-201 Hadley 12.47 kV 12.5 6.6 Solar Withdrawn Dec 2022
AH1-497 Hadley 12.47kV 12.5 3.2 Solar Withdrawn Jun 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.