Mendota Hills Wind Farm

PJM queue ID AB2-191

Mendota Hills Wind Farm (AB2-191) is listed in the PJM interconnection queue as a 8.4 MW wind project in Lee County, IL. The filing names Mendota Hills as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 1, 2019.

Queue IDAB2-191
Project nameMendota Hills Wind Farm
Status (as published)In Service
SubstationMendota Hills
Point of interconnectionMendota Hills
CountyLee
StateIL
VoltageNot reported
Capacity8.4 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2019-03-01
Source datasetserial

Same substation and county

Mendota Hills substation: 4 requests in the PJM queue, 3 active totaling 14.7 MW.

Queue IDProjectMWResourceStatus
Z1-073Mendota Hills5.2WindIn Service
AD1-067Mendota Hills Wind Farm1.1WindIn Service
AI2-429Mendota Hills 138 kV22.2WindWithdrawn

Lee, IL: 106 requests in the PJM queue, 30 active totaling 2,565.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity8.4
MFO70.4

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.