Mendota Hills Wind Farm
PJM queue ID AB2-191
Mendota Hills Wind Farm (AB2-191) is listed in the PJM interconnection queue as a 8.4 MW wind project in Lee County, IL. The filing names Mendota Hills as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 1, 2019.
| Queue ID | AB2-191 |
|---|---|
| Project name | Mendota Hills Wind Farm |
| Status (as published) | In Service |
| Substation | Mendota Hills |
| Point of interconnection | Mendota Hills |
| County | Lee |
| State | IL |
| Voltage | Not reported |
| Capacity | 8.4 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2019-03-01 |
| Source dataset | serial |
Same substation and county
Mendota Hills substation: 4 requests in the PJM queue, 3 active totaling 14.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Z1-073 | Mendota Hills | 5.2 | Wind | In Service |
| AD1-067 | Mendota Hills Wind Farm | 1.1 | Wind | In Service |
| AI2-429 | Mendota Hills 138 kV | 22.2 | Wind | Withdrawn |
Lee, IL: 106 requests in the PJM queue, 30 active totaling 2,565.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 8.4 |
| MFO | 70.4 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.