McLean - Brokaw substation interconnection queue
2 active projects totaling 0 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name McLean - Brokaw as the point of interconnection, all in McLean County, IL.
Target commercial operation dates as filed run from Jun 2032 to May 2033 (3 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: ComEd (3 filings).
2active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1540 | McLean 345 kV - Brokaw 345 kV 345 kV | 345 | 0 | Solar | Active | Jun 2032 |
| C01-1740 | McLean 345 kV - Brokaw 345 kV 345 kV | 345 | 0 | Solar | Active | Dec 2032 |
| C01-1741 | McLean 345 kV - Brokaw 345 kV 345 kV | 345 | 0 | Solar | Withdrawn | May 2033 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in McLean County, IL
- McLean: 4 active, 264 MW of 5 filed
- Twin Grove: 2 active, 198.7 MW of 2 filed
- Blue Mound: 2 active, 40 MW of 3 filed
- Blue Mound I: 1 active, 39.6 MW of 2 filed
- Brokaw-Pontiac Midpoint: 1 active, 32.5 MW of 4 filed
- Blue Mound-Chestnut: none active of 6 filed
- Pontiac Midpoint: none active of 4 filed
- Bluemond-Chestnut (CIR Increase): none active of 2 filed
- Brokaw to Mt Pulaski: none active of 2 filed
- Twin Groves: none active of 2 filed