Brokaw-Pontiac Midpoint substation interconnection queue
1 active project totalling 32.5 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
32.5active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-047 | Blooming Grove WF | n/r | 32.5 | Wind | In Service |
| AD2-153 | Brokaw-Pontiac Midpoint | n/r | 26.4 | Wind | Withdrawn |
| AD2-154 | Brokaw-Pontiac Midpoint | n/r | 26.4 | Wind | Withdrawn |
| AD2-155 | Brokaw-Pontiac Midpoint | n/r | 26.4 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.