Brokaw-Pontiac Midpoint substation interconnection queue
1 active project totaling 32.5 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name Brokaw-Pontiac Midpoint as the point of interconnection, all in IL.
Target commercial operation date as filed: Dec 2020 (4 filings).
1active projects
32.5active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-047 | Blooming Grove WF | n/r | 32.5 | Wind | In Service | Dec 2020 |
| AD2-153 | Brokaw-Pontiac Midpoint | n/r | 26.4 | Wind | Withdrawn | Dec 2020 |
| AD2-154 | Brokaw-Pontiac Midpoint | n/r | 26.4 | Wind | Withdrawn | Dec 2020 |
| AD2-155 | Brokaw-Pontiac Midpoint | n/r | 26.4 | Wind | Withdrawn | Dec 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in McLean County, IL
- McLean: 4 active, 264 MW of 5 filed
- Twin Grove: 2 active, 198.7 MW of 2 filed
- Blue Mound: 2 active, 40 MW of 3 filed
- Blue Mound I: 1 active, 39.6 MW of 2 filed
- Blue Mound-Chestnut: none active of 6 filed
- Pontiac Midpoint: none active of 4 filed
- McLean - Brokaw: 2 active, 0 MW of 3 filed
- Bluemond-Chestnut (CIR Increase): none active of 2 filed
- Brokaw to Mt Pulaski: none active of 2 filed
- Twin Groves: none active of 2 filed
Other PJM queue substations in Kankakee County, IL
- Davis Creek: 7 active, 725.4 MW of 15 filed
- Loretto-Wilton & Braidwood-Davis Creek: 3 active, 318 MW of 3 filed
- TSS 905 Essex: 1 active, 150 MW of 2 filed
- Kankakee: 2 active, 70 MW of 7 filed
- Kensington: 1 active, 56 MW of 4 filed
- Wilmington-Davis Creek: none active of 3 filed
- AD1-100 (CIR Increase): none active of 2 filed
- Braidwood-Davis Creek: none active of 2 filed
- Davis Creek - Bloom: none active of 2 filed
- Kensington/Kankakee: none active of 2 filed