Brokaw-Pontiac Midpoint substation interconnection queue

1 active project totalling 32.5 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
32.5active MW
4total filed
Queue IDProjectkVMWResourceStatus
AB2-047 Blooming Grove WF n/r 32.5 Wind In Service
AD2-153 Brokaw-Pontiac Midpoint n/r 26.4 Wind Withdrawn
AD2-154 Brokaw-Pontiac Midpoint n/r 26.4 Wind Withdrawn
AD2-155 Brokaw-Pontiac Midpoint n/r 26.4 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.