Blue Mound-Chestnut substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).
0active projects
0active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-400 | Blue Mound-Chestnut 345 kV | 345 | 150 | Battery | Withdrawn |
| AG1-402 | Blue Mound-Chestnut 345 kV | 345 | 150 | Battery | Withdrawn |
| AG1-404 | Blue Mound-Chestnut 345 kV | 345 | 100 | Battery | Withdrawn |
| AG1-399 | Blue Mound-Chestnut 345 kV | 345 | 52.8 | Wind | Withdrawn |
| AH1-670 | Blue Mound-Chestnut 345 kV | 345 | 49.6 | Wind | Withdrawn |
| AG1-403 | Blue Mound-Chestnut 345 kV | 345 | 33.1 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.