Blue Mound-Chestnut substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
AG1-400 Blue Mound-Chestnut 345 kV 345 150 Battery Withdrawn
AG1-402 Blue Mound-Chestnut 345 kV 345 150 Battery Withdrawn
AG1-404 Blue Mound-Chestnut 345 kV 345 100 Battery Withdrawn
AG1-399 Blue Mound-Chestnut 345 kV 345 52.8 Wind Withdrawn
AH1-670 Blue Mound-Chestnut 345 kV 345 49.6 Wind Withdrawn
AG1-403 Blue Mound-Chestnut 345 kV 345 33.1 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.