Blooming Grove Solar Energy Center

PJM queue ID AE1-205

Blooming Grove Solar Energy Center (AE1-205) is listed in the PJM interconnection queue as a 84 MW solar project in Livingston County, IL. The filing names McLean as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 29, 2028.

Queue IDAE1-205
Project nameBlooming Grove Solar Energy Center
Status (as published)Engineering and Procurement
SubstationMcLean
Point of interconnectionMcLean 345 kV
CountyLivingston
StateIL
Voltage345 kV
Capacity84 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-29
Source datasetserial

Same substation and county

McLean substation: 5 requests in the PJM queue, 4 active totaling 264 MW.

Queue IDProjectMWResourceStatus
C01-1164McLean 345 kV97.5WindActive
AF2-225Bright Stalk Generating Facility63SolarEP
AE2-223Bright Stalk Generating Facility19.5WindEP
AE2-173Blooming Grove Solar Energy Center50BatteryWithdrawn

Livingston, IL: 47 requests in the PJM queue, 13 active totaling 1,544.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity84
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.