Twin Grove substation interconnection queue
2 active projects totaling 198.7 MW in the PJM queue.
2 PJM queue filings name Twin Grove as the point of interconnection, all in McLean County, IL.
Target commercial operation date as filed: Jun 2026 (2 filings).
Transmission owner as filed: ComEd (2 filings).
2active projects
198.7active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1436 | Twin Grove 345 kV | 345 | 100 | Wind | Active | Jun 2026 |
| C01-1867 | Twin Grove 345 kV | 345 | 98.7 | Wind | Active | Jun 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in McLean County, IL
- McLean: 4 active, 264 MW of 5 filed
- Blue Mound: 2 active, 40 MW of 3 filed
- Blue Mound I: 1 active, 39.6 MW of 2 filed
- Brokaw-Pontiac Midpoint: 1 active, 32.5 MW of 4 filed
- Blue Mound-Chestnut: none active of 6 filed
- Pontiac Midpoint: none active of 4 filed
- McLean - Brokaw: 2 active, 0 MW of 3 filed
- Bluemond-Chestnut (CIR Increase): none active of 2 filed
- Brokaw to Mt Pulaski: none active of 2 filed
- Twin Groves: none active of 2 filed
Site Scanner