Blue Mound I substation interconnection queue
1 active project totalling 39.6 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
39.6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-104 | Blue Mound I | n/r | 100 | Solar | Withdrawn |
| S27 | Twin Groves I WF | n/r | 39.6 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.