Substation Scout

Blue Mound I substation interconnection queue

1 active project totalling 39.6 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
39.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-104 Blue Mound I n/r 100 Solar Withdrawn
S27 Twin Groves I WF n/r 39.6 Wind In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.