Hillandale Solar

PJM queue ID AE2-291

Hillandale Solar (AE2-291) is listed in the PJM interconnection queue as a 61.2 MW solar project in Pittsylvania County, VA. The filing names Grit DP-Perth as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of May 28, 2030.

Queue IDAE2-291
Project nameHillandale Solar
Status (as published)EP
SubstationGrit DP-Perth
Point of interconnectionGrit DP-Perth 115 kV
CountyPittsylvania
StateVA
Voltage115 kV
Capacity61.2 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2030-05-28
Source datasetcycle

Same substation and county

Grit DP-Perth substation: 3 requests in the PJM queue, 1 active totaling 61.2 MW.

Queue IDProjectMWResourceStatus
AE2-292Grit DP-Perth 115 kV76.2SolarWithdrawn
AG1-539Grit DP-Perth 115 kV32BatteryWithdrawn

Pittsylvania, VA: 39 requests in the PJM queue, 14 active totaling 751.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperHillandale Solar, LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy102.0
MW capacity61.2
MFO102.0
Submitted date3/29/2019
Last updated10/14/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first