1 active project totaling 46.9 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name West Newton-Lynn as the point of interconnection, all in Hardin County, OH.
Target commercial operation dates as filed run from Dec 2021 to Jan 2029 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
46.9active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-091 | Strawhat Solar Energy Center | 138 | 46.9 | Solar | Engineering and Procurement | Jan 2029 |
| AI2-173 | West Newton-Lynn 138 kV | 138 | 26.4 | Solar | Withdrawn | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-16 | AE1-091 | Status change | n/a | Suspended → Engineering and Procurement |
Other PJM queue substations in Hardin County, OH
- Hardin Switch: 7 active, 409.9 MW of 9 filed
- East Lima-Marysville: 3 active, 89.5 MW of 6 filed
- Gunn Road: 2 active, 74 MW of 4 filed
- South Kenton: 1 active, 32.7 MW of 3 filed
- Ada-Dunkirk: 2 active, 12 MW of 3 filed
- East Lima-South Kenton: none active of 3 filed
- Forest: none active of 3 filed
- Marysville-Gunn Road: none active of 2 filed