West Newton-Lynn substation interconnection queue

1 active project totaling 46.9 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name West Newton-Lynn as the point of interconnection, all in Hardin County, OH.

Target commercial operation dates as filed run from Dec 2021 to Jan 2029 (2 filings). 1 active filing targets a date after November 27, 2026.

1active projects
46.9active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-091 Strawhat Solar Energy Center 138 46.9 Solar Engineering and Procurement Jan 2029
AI2-173 West Newton-Lynn 138 kV 138 26.4 Solar Withdrawn Dec 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-16AE1-091Status changen/a Suspended → Engineering and Procurement

Other PJM queue substations in Hardin County, OH

All 39 PJM queue filings in Hardin County, OH.