Forest substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
H24 Forest 230kV 230 575 Gas Withdrawn
Y1-030 Forest 69kV 69 13 Wind Withdrawn
AA2-186 Forest 69kV 69 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.