Forest substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| H24 | Forest 230kV | 230 | 575 | Gas | Withdrawn |
| Y1-030 | Forest 69kV | 69 | 13 | Wind | Withdrawn |
| AA2-186 | Forest 69kV | 69 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.