East Lima-South Kenton substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
U2-042 East Lima-South Kenton 138kV 138 26.1 Wind Withdrawn
U1-060 East Lima-South Kenton 138kV 138 19.7 Wind Withdrawn
W1-037 East Lima-South Kenton 138kV 138 7.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.