East Lima-South Kenton substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
Target commercial operation dates as filed run from Apr 2011 to Dec 2011 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| U2-042 | East Lima-South Kenton 138kV | 138 | 26.1 | Wind | Withdrawn | Dec 2011 |
| U1-060 | East Lima-South Kenton 138kV | 138 | 19.7 | Wind | Withdrawn | Apr 2011 |
| W1-037 | East Lima-South Kenton 138kV | 138 | 7.6 | Solar | Withdrawn | Dec 2011 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Hardin County, OH
- Hardin Switch: 7 active, 409.9 MW of 9 filed
- East Lima-Marysville: 3 active, 89.5 MW of 6 filed
- Gunn Road: 2 active, 74 MW of 4 filed
- West Newton-Lynn: 1 active, 46.9 MW of 2 filed
- South Kenton: 1 active, 32.7 MW of 3 filed
- Ada-Dunkirk: 2 active, 12 MW of 3 filed
- Forest: none active of 3 filed
- Marysville-Gunn Road: none active of 2 filed
Site Scanner