Gunn Road substation interconnection queue

2 active projects totaling 74 MW in the PJM queue, plus 2 with terminal status (shown grayed).

4 PJM queue filings name Gunn Road as the point of interconnection, all in Hardin County, OH.

Target commercial operation dates as filed run from Dec 2019 to Dec 2026 (4 filings). 2 active filings target a date after November 27, 2026.

2active projects
74active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-285 Scioto Solar 345 56 Hybrid Partially in Service - Under Construction Dec 2026
AI2-452 Gunn Road 345 kV 345 51.8 Solar Withdrawn Dec 2025
AC2-124 Gunn Road 345kV 345 19 Solar Withdrawn Dec 2019
AE2-306 Scioto Solar 345 18 Solar Partially in Service - Under Construction Dec 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-02AF1-285Status changen/a Under Construction → Partially in Service - Under Construction
2026-11-02AE2-306Status changen/a Under Construction → Partially in Service - Under Construction

Other PJM queue substations in Hardin County, OH

All 39 PJM queue filings in Hardin County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first