Gunn Road substation interconnection queue
2 active projects totaling 74 MW in the PJM queue, plus 2 with terminal status (shown grayed).
4 PJM queue filings name Gunn Road as the point of interconnection, all in Hardin County, OH.
Target commercial operation dates as filed run from Dec 2019 to Dec 2026 (4 filings). 2 active filings target a date after November 27, 2026.
2active projects
74active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-285 | Scioto Solar | 345 | 56 | Hybrid | Partially in Service - Under Construction | Dec 2026 |
| AI2-452 | Gunn Road 345 kV | 345 | 51.8 | Solar | Withdrawn | Dec 2025 |
| AC2-124 | Gunn Road 345kV | 345 | 19 | Solar | Withdrawn | Dec 2019 |
| AE2-306 | Scioto Solar | 345 | 18 | Solar | Partially in Service - Under Construction | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-02 | AF1-285 | Status change | n/a | Under Construction → Partially in Service - Under Construction |
| 2026-11-02 | AE2-306 | Status change | n/a | Under Construction → Partially in Service - Under Construction |
Other PJM queue substations in Hardin County, OH
- Hardin Switch: 7 active, 409.9 MW of 9 filed
- East Lima-Marysville: 3 active, 89.5 MW of 6 filed
- West Newton-Lynn: 1 active, 46.9 MW of 2 filed
- South Kenton: 1 active, 32.7 MW of 3 filed
- Ada-Dunkirk: 2 active, 12 MW of 3 filed
- East Lima-South Kenton: none active of 3 filed
- Forest: none active of 3 filed
- Marysville-Gunn Road: none active of 2 filed