2 active projects totalling 74 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
74active MW
4total filed
Queue IDProjectkVMWResourceStatus
AF1-285 Scioto Solar 345 56 Hybrid Under Construction
AI2-452 Gunn Road 345 kV 345 51.8 Solar Withdrawn
AC2-124 Gunn Road 345kV 345 19 Solar Withdrawn
AE2-306 Scioto Solar 345 18 Solar Under Construction

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.