Scioto Ridge Wind Farm
PJM queue ID U2-072
Scioto Ridge Wind Farm (U2-072) is listed in the PJM interconnection queue as a 32.5 MW wind project in Hardin County, OH. The filing names East Lima-Marysville as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 31, 2021.
| Queue ID | U2-072 |
|---|---|
| Project name | Scioto Ridge Wind Farm |
| Status (as published) | In Service |
| Substation | East Lima-Marysville |
| Point of interconnection | East Lima-Marysville 345kV |
| County | Hardin |
| State | OH |
| Voltage | 345 kV |
| Capacity | 32.5 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2021-05-31 |
| Source dataset | serial |
Same substation and county
East Lima-Marysville substation: 6 requests in the PJM queue, 3 active totaling 89.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB2-170 | Hardin Energy Center | 49.4 | Solar | In Service |
| V3-028 | Hardin Energy Center | 7.6 | Solar | In Service |
| AI2-491 | East Lima-Marysville 345kV | 133 | Wind | Withdrawn |
| AI2-270 | East Lima-Marysville 345kV | 45 | Solar | Withdrawn |
| U2-041 | Hardin Wind Farm | 21.7 | Wind | Withdrawn |
Hardin, OH: 39 requests in the PJM queue, 18 active totaling 715 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 249.795 |
| MW capacity | 32.5 |
| MFO | 249.795 |