Ada-Dunkirk substation interconnection queue

2 active projects totaling 12 MW in the PJM queue, plus 1 with terminal status (shown grayed).

3 PJM queue filings name Ada-Dunkirk as the point of interconnection, all in Hardin County, OH.

Target commercial operation dates as filed run from Dec 2017 to Feb 2023 (3 filings).

2active projects
12active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-107 Ada-Dunkirk 69kV 69 31.7 Wind Withdrawn Feb 2023
U1-059 Hog Creek Wind Farm 69 9.6 Wind In Service Dec 2017
W1-056 Hog Creek Wind Farm 69 2.4 Wind In Service Dec 2017

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.