Hardin Switch substation interconnection queue

7 active projects totaling 409.9 MW in the PJM queue, plus 2 with terminal status (shown grayed).

9 PJM queue filings name Hardin Switch as the point of interconnection, all in Hardin County, OH.

Target commercial operation dates as filed run from Jun 2023 to Apr 2028 (9 filings). 4 active filings target a date after November 27, 2026.

Transmission owner as filed: AEP (3 filings).

7active projects
409.9active MW
9total filed
Queue IDProjectkVMWResourceStatusTarget COD
AD2-086 Hardin Energy Center – Phase 3 345 138 Solar In Service Dec 2025
AD1-130 Hardin Energy Center – Phase 2 345 101.5 Solar In Service Dec 2024
AI2-149 Hardin Switch 345 kV 345 67.2 Solar Withdrawn Dec 2023
C01-1653 Hardin Switch 345 kV 345 67.2 Solar Active Apr 2028
AE2-216 Hardin Energy Center – Storage II 345 55 Battery Suspended Dec 2026
AI2-181 Hardin Switch 345 kV 345 27.8 Solar Withdrawn Jun 2023
C01-1652 Hardin Switch 345 kV 345 27.8 Solar Active Apr 2028
AE1-090 Hardin Energy Center - Phase 3 345 12 Solar In Service Dec 2025
AH1-327 Hardin Switch 345 kV 345 8.4 Solar Active Nov 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Hardin County, OH

All 39 PJM queue filings in Hardin County, OH.