Substation Scout

Hardin Switch substation interconnection queue

7 active projects totalling 409.9 MW in the PJM queue, plus 2 with terminal status (shown greyed).

7active projects
409.9active MW
9total filed
Queue IDProjectkVMWResourceStatus
AD2-086 Hardin Energy Center – Phase 3 345 138 Solar In Service
AD1-130 Hardin Energy Center – Phase 2 345 101.5 Solar In Service
AI2-149 Hardin Switch 345 kV 345 67.2 Solar Withdrawn
C01-1653 Hardin Switch 345 kV 345 67.2 Solar Active
AE2-216 Hardin Energy Center – Storage II 345 55 Battery Suspended
AI2-181 Hardin Switch 345 kV 345 27.8 Solar Withdrawn
C01-1652 Hardin Switch 345 kV 345 27.8 Solar Active
AE1-090 Hardin Energy Center - Phase 3 345 12 Solar In Service
AH1-327 Hardin Switch 345 kV 345 8.4 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.