Hardin Switch substation interconnection queue
7 active projects totaling 409.9 MW in the PJM queue, plus 2 with terminal status (shown grayed).
9 PJM queue filings name Hardin Switch as the point of interconnection, all in Hardin County, OH.
Target commercial operation dates as filed run from Jun 2023 to Apr 2028 (9 filings). 4 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (3 filings).
7active projects
409.9active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD2-086 | Hardin Energy Center – Phase 3 | 345 | 138 | Solar | In Service | Dec 2025 |
| AD1-130 | Hardin Energy Center – Phase 2 | 345 | 101.5 | Solar | In Service | Dec 2024 |
| AI2-149 | Hardin Switch 345 kV | 345 | 67.2 | Solar | Withdrawn | Dec 2023 |
| C01-1653 | Hardin Switch 345 kV | 345 | 67.2 | Solar | Active | Apr 2028 |
| AE2-216 | Hardin Energy Center – Storage II | 345 | 55 | Battery | Suspended | Dec 2026 |
| AI2-181 | Hardin Switch 345 kV | 345 | 27.8 | Solar | Withdrawn | Jun 2023 |
| C01-1652 | Hardin Switch 345 kV | 345 | 27.8 | Solar | Active | Apr 2028 |
| AE1-090 | Hardin Energy Center - Phase 3 | 345 | 12 | Solar | In Service | Dec 2025 |
| AH1-327 | Hardin Switch 345 kV | 345 | 8.4 | Solar | Active | Nov 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Hardin County, OH
- East Lima-Marysville: 3 active, 89.5 MW of 6 filed
- Gunn Road: 2 active, 74 MW of 4 filed
- West Newton-Lynn: 1 active, 46.9 MW of 2 filed
- South Kenton: 1 active, 32.7 MW of 3 filed
- Ada-Dunkirk: 2 active, 12 MW of 3 filed
- East Lima-South Kenton: none active of 3 filed
- Forest: none active of 3 filed
- Marysville-Gunn Road: none active of 2 filed