Substation Scout

Hardin Energy Center

PJM queue ID V3-028

Hardin Energy Center (V3-028) is listed in the PJM interconnection queue as a 7.6 MW solar project in Hardin County, OH. The filing names East Lima-Marysville as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2021.

Queue IDV3-028
Project nameHardin Energy Center
Status (as published)In Service
SubstationEast Lima-Marysville
Point of interconnectionEast Lima-Marysville 345kV
CountyHardin
StateOH
Voltage345 kV
Capacity7.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2021-06-01
Source datasetserial

Same substation and county

East Lima-Marysville substation: 6 requests in the PJM queue, 3 active totaling 89.5 MW.

Queue IDProjectMWResourceStatus
AB2-170Hardin Energy Center49.4SolarIn Service
U2-072Scioto Ridge Wind Farm32.5WindIn Service
AI2-491East Lima-Marysville 345kV133WindWithdrawn
AI2-270East Lima-Marysville 345kV45SolarWithdrawn
U2-041Hardin Wind Farm21.7WindWithdrawn

Hardin, OH: 39 requests in the PJM queue, 18 active totaling 715 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity7.6
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first