Byron - Wayne 345 kV

PJM queue ID C01-1967

Byron - Wayne 345 kV (C01-1967) is listed in the PJM interconnection queue as a 198.6 MW wind project in DeKalb County, IL. The filing names Byron - Wayne as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 16, 2031.

Queue IDC01-1967
Project nameByron - Wayne 345 kV
Status (as published)Active
SubstationByron - Wayne
Point of interconnectionByron - Wayne 345 kV
CountyDeKalb
StateIL
Voltage345 kV
Capacity198.6 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2031-05-16
Source datasetcycle

Same substation and county

Byron - Wayne substation: 3 requests in the PJM queue, 1 active totaling 198.6 MW.

Queue IDProjectMWResourceStatus
AH2-087Byron - Wayne 345 kV50BatteryWithdrawn
AH2-088Byron - Wayne 345 kV50BatteryWithdrawn

DeKalb, IL: 40 requests in the PJM queue, 3 active totaling 435.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperRiverwood Wind, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy300.0
MW capacity198.6
MFO300.0
Submitted date4/27/2026
Last updated10/9/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.