Substation Scout

Bremo substation interconnection queue

3 active projects totaling 2,185 MW in the PJM queue, plus 1 with terminal status (shown grayed).

4 PJM queue filings name Bremo as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Mar 2011 to Mar 2033 (4 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: Dominion (2 filings).

3active projects
2,185active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-2124 Bremo 230 kV 230 780 Gas Active Mar 2033
C01-2125 Bremo 230 kV 230 780 Gas Active Mar 2033
P38 Bremo 230 625 Gas In Service Mar 2011
AI2-005 Bremo 115 kV 115 100 Battery Withdrawn May 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Bremo (DOM, 9 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Fluvanna County, VA

All 31 PJM queue filings in Fluvanna County, VA.

Other PJM queue substations in Buckingham County, VA

All 27 PJM queue filings in Buckingham County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first