Cunningham substation interconnection queue

6 active projects totalling 1,704.6 MW in the PJM queue, plus 1 with terminal status (shown greyed).

6active projects
1,704.6active MW
7total filed
Queue IDProjectkVMWResourceStatus
AH1-723 Cunningham 500 kV 500 712 Hybrid Active
AH1-712 Cunningham 500 kV 500 611 Hybrid Active
C01-2123 Cunningham 500 kV 500 209 Gas Active
C01-2122 Cunningham 500 kV 500 108 Gas Active
AB1-181 Cunningham 500kV 500 37.3 Gas In Service
AH1-681 Cunningham 500 kV 500 27.3 Gas Active
AB1-117 Cunningham 500kV 500 17.3 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.