Cunningham substation interconnection queue
6 active projects totalling 1,704.6 MW in the PJM queue, plus 1 with terminal status (shown greyed).
6active projects
1,704.6active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-723 | Cunningham 500 kV | 500 | 712 | Hybrid | Active |
| AH1-712 | Cunningham 500 kV | 500 | 611 | Hybrid | Active |
| C01-2123 | Cunningham 500 kV | 500 | 209 | Gas | Active |
| C01-2122 | Cunningham 500 kV | 500 | 108 | Gas | Active |
| AB1-181 | Cunningham 500kV | 500 | 37.3 | Gas | In Service |
| AH1-681 | Cunningham 500 kV | 500 | 27.3 | Gas | Active |
| AB1-117 | Cunningham 500kV | 500 | 17.3 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.