Fluvanna, VA interconnection queue

8 active projects totalling 3,264.6 MW in the PJM queue, plus 23 with terminal status (shown greyed).

8active projects
3,264.6active MW
31total filed
Queue IDProjectkVMWResourceStatus
C01-2124 Bremo 230 kV 230 780 Gas Active
C01-2125 Bremo 230 kV 230 780 Gas Active
AH1-723 Cunningham 500 kV 500 712 Hybrid Active
AH1-712 Cunningham 500 kV 500 611 Hybrid Active
C01-2123 Cunningham 500 kV 500 209 Gas Active
AF1-293 Kidds Store-Fort Union 115 kV 115 108.4 Hybrid Withdrawn
C01-2122 Cunningham 500 kV 500 108 Gas Active
AI2-005 Bremo 115 kV 115 100 Battery Withdrawn
AH1-018 Cunningham - Elmont 500 kV 500 89 Solar Withdrawn
AH1-019 Cunningham - Elmont 500 kV II 500 89 Solar Withdrawn
AF2-397 Fork Union-Mt. Eagle 230 kV 230 78 Hybrid Withdrawn
AG2-521 Fork Union 230 kV 230 51 Solar Withdrawn
AD2-173 Bremo-Kidds Store 115 kV 115 48 Solar Withdrawn
AG2-259 Sherwood - Kidds Store 115 kV 115 48 Solar Withdrawn
AG1-284 Fork Union 115 kV 115 42 Solar Withdrawn
AB1-181 Cunningham 500kV 500 37.3 Gas In Service
AH1-375 Cobbs Creek- James River 115kV 115 36 Solar Withdrawn
AG1-550 Mount Eagle-Fork Union 230 kV 230 35 Hybrid Withdrawn
AH1-217 Kidds Store - Fork Union 115 kV II 115 34.2 Solar Withdrawn
AH1-213 James River 115 kV 115 31.5 Hybrid Withdrawn
AH1-681 Cunningham 500 kV 500 27.3 Gas Active
AH1-020 Kidds Store – Fork Union 115 kV 115 22 Solar Withdrawn
AH1-441 Cunningham - Elmont 500 kV III 500 20 Battery Withdrawn
AH1-442 Cunningham - Elmont 500 kV IV 500 20 Battery Withdrawn
AB1-117 Cunningham 500kV 500 17.3 Gas Withdrawn
AH1-443 Kidds Store - Fork Union 115 kV II 115 15 Battery Withdrawn
AE1-009 Bremo-Cunningham DP 115 kV 115 13.1 Solar Withdrawn
AG2-565 Kidds Store - Sherwood 115 kV 115 12 Battery Withdrawn
AH1-508 Bremo-Fork Union Military Academy 34.5 kV 34.5 9.6 Solar Withdrawn
AH1-415 Bremo Bluff 34.5kV 34.5 8.6 Solar Withdrawn
AF2-403 Shockoe Storage / Shockoe DP-Chatham 69 kV 69 8 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.