Substation Scout

King George, VA interconnection queue

6 active projects totalling 328 MW in the PJM queue, plus 11 with terminal status (shown greyed).

6active projects
328active MW
17total filed
Queue IDProjectkVMWResourceStatus
T149 Birchwood 230kV 230 580 Gas Withdrawn
AH2-144 Birchwood-NUG 230kV 230 150 Battery Withdrawn
AI2-456 Birchwood - Fines Corner 230 kV 230 150 Battery Withdrawn
C01-2256 Birchwood - Fines corner 230 kV 230 150 Battery Active
AF2-013 Harwood Power 230 100 Battery Engineering and Procurement
AG1-019 Arnold's Corner-Dahlgren 230 kV 230 100 Battery Withdrawn
AG2-303 Birchwood 230 kV 230 100 Battery Withdrawn
AI2-080 Oak Grove-Dahlgren 230 kV 230 73.4 Solar Withdrawn
AH2-145 Birchwood-NUG 230kV 230 52.3 Battery Withdrawn
AF1-114 Gibson Solar I 230 42 Solar Engineering and Procurement
AG2-199 Birchwood-NUG 230 kV 230 35.7 Solar Withdrawn
AF2-091 Gibson Solar I 230 14.3 Solar Engineering and Procurement
C01-1209 Dahlgren 34.5 kV 34.5 13.2 Solar Active
AB2-072 Arnold's Corner 34.5kV 34.5 12.2 Solar Withdrawn
T78 King George Renewable Energy Facility 34.5 8.5 Gas In Service
AG1-212 Not reported n/r 2.8 Battery Withdrawn
AG2-020 Arnolds Corner Energy Storage 34.5 2.8 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.