King George, VA interconnection queue
6 active projects totalling 328 MW in the PJM queue, plus 11 with terminal status (shown greyed).
6active projects
328active MW
17total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| T149 | Birchwood 230kV | 230 | 580 | Gas | Withdrawn |
| AH2-144 | Birchwood-NUG 230kV | 230 | 150 | Battery | Withdrawn |
| AI2-456 | Birchwood - Fines Corner 230 kV | 230 | 150 | Battery | Withdrawn |
| C01-2256 | Birchwood - Fines corner 230 kV | 230 | 150 | Battery | Active |
| AF2-013 | Harwood Power | 230 | 100 | Battery | Engineering and Procurement |
| AG1-019 | Arnold's Corner-Dahlgren 230 kV | 230 | 100 | Battery | Withdrawn |
| AG2-303 | Birchwood 230 kV | 230 | 100 | Battery | Withdrawn |
| AI2-080 | Oak Grove-Dahlgren 230 kV | 230 | 73.4 | Solar | Withdrawn |
| AH2-145 | Birchwood-NUG 230kV | 230 | 52.3 | Battery | Withdrawn |
| AF1-114 | Gibson Solar I | 230 | 42 | Solar | Engineering and Procurement |
| AG2-199 | Birchwood-NUG 230 kV | 230 | 35.7 | Solar | Withdrawn |
| AF2-091 | Gibson Solar I | 230 | 14.3 | Solar | Engineering and Procurement |
| C01-1209 | Dahlgren 34.5 kV | 34.5 | 13.2 | Solar | Active |
| AB2-072 | Arnold's Corner 34.5kV | 34.5 | 12.2 | Solar | Withdrawn |
| T78 | King George Renewable Energy Facility | 34.5 | 8.5 | Gas | In Service |
| AG1-212 | Not reported | n/r | 2.8 | Battery | Withdrawn |
| AG2-020 | Arnolds Corner Energy Storage | 34.5 | 2.8 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.