Arnold's Corner-Dahlgren substation interconnection queue
1 active project totaling 100 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Arnold's Corner-Dahlgren as the point of interconnection, all in King George County, VA.
Target commercial operation dates as filed run from Oct 2023 to Oct 2029 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (1 filing).
1active projects
100active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-013 | Harwood Power | 230 | 100 | Battery | Engineering and Procurement | Oct 2029 |
| AG1-019 | Arnold's Corner-Dahlgren 230 kV | 230 | 100 | Battery | Withdrawn | Oct 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in King George County, VA
- Oak Grove-Dahlgren: 2 active, 56.3 MW of 3 filed
- Arnolds Corner: 1 active, 8.5 MW of 2 filed
- Birchwood: none active of 3 filed
- Birchwood-NUG: none active of 3 filed