Substation Scout

Arnolds Corner substation interconnection queue

1 active project totaling 8.5 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Arnolds Corner as the point of interconnection, all in King George County, VA.

Target commercial operation dates as filed run from May 2010 to Dec 2022 (2 filings).

Transmission owner as filed: Dominion (1 filing).

1active projects
8.5active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
T78 King George Renewable Energy Facility 34.5 8.5 Gas In Service May 2010
AG2-020 Arnolds Corner Energy Storage 34.5 2.8 Battery Withdrawn Dec 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in King George County, VA

All 17 PJM queue filings in King George County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first