Arnolds Corner substation interconnection queue
1 active project totaling 8.5 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Arnolds Corner as the point of interconnection, all in King George County, VA.
Target commercial operation dates as filed run from May 2010 to Dec 2022 (2 filings).
Transmission owner as filed: Dominion (1 filing).
1active projects
8.5active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| T78 | King George Renewable Energy Facility | 34.5 | 8.5 | Gas | In Service | May 2010 |
| AG2-020 | Arnolds Corner Energy Storage | 34.5 | 2.8 | Battery | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in King George County, VA
- Arnold's Corner-Dahlgren: 1 active, 100 MW of 2 filed
- Oak Grove-Dahlgren: 2 active, 56.3 MW of 3 filed
- Birchwood: none active of 3 filed
- Birchwood-NUG: none active of 3 filed
Site Scanner