Oak Grove-Dahlgren substation interconnection queue
2 active projects totaling 56.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Oak Grove-Dahlgren as the point of interconnection, all in King George County, VA.
Target commercial operation dates as filed run from Dec 2025 to Dec 2029 (3 filings). 2 active filings target a date after November 27, 2026.
2active projects
56.3active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-080 | Oak Grove-Dahlgren 230 kV | 230 | 73.4 | Solar | Withdrawn | Dec 2025 |
| AF1-114 | Gibson Solar I | 230 | 42 | Solar | Engineering and Procurement | Dec 2028 |
| AF2-091 | Gibson Solar I | 230 | 14.3 | Solar | Engineering and Procurement | Dec 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in King George County, VA
- Arnold's Corner-Dahlgren: 1 active, 100 MW of 2 filed
- Arnolds Corner: 1 active, 8.5 MW of 2 filed
- Birchwood: none active of 3 filed
- Birchwood-NUG: none active of 3 filed