Birchwood-NUG substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH2-144 Birchwood-NUG 230kV 230 150 Battery Withdrawn
AH2-145 Birchwood-NUG 230kV 230 52.3 Battery Withdrawn
AG2-199 Birchwood-NUG 230 kV 230 35.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.