Birchwood-NUG substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-144 | Birchwood-NUG 230kV | 230 | 150 | Battery | Withdrawn |
| AH2-145 | Birchwood-NUG 230kV | 230 | 52.3 | Battery | Withdrawn |
| AG2-199 | Birchwood-NUG 230 kV | 230 | 35.7 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.