Substation Scout

Harris, TX interconnection queue

32 active projects totalling 6,833.7 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

32active projects
6,833.7active MW
34total filed
Queue IDProjectkVMWResourceStatus
26INR0546 Hobby BESS I 138 602.6 Battery SS Completed, FIS Completed, No IA
26INR0545 Knight Airport BESS I 138 522.5 Battery SS Completed, FIS Started, No IA
24INR0410 NRG Greens Bayou 6 (TEF-Due Diligence) 138 445 Gas SS Completed, FIS Completed, IA
23INR0127 Beacon Storage 345 408.7 Battery SS Completed, FIS Started, No IA
23INR0126 Sigma Storage 138 408.4 Battery SS Completed, FIS Started, No IA
24INR0500 Claire BESS 138 406 Battery SS Completed, FIS Started, No IA
29INR0245 Texas Deepwater BESS 138 313.3 Battery SS Completed, FIS Started, No IA
24INR0413 Furay Battery Energy Storage System 138 304 Battery SS Completed, FIS Started, No IA
26INR0503 Rex Storage 138 256.4 Battery SS Completed, FIS Started, No IA
25INR0434 Bluegill BESS 138 251 Battery SS Completed, FIS Started, No IA
25INR0420 Houston BESS 138 227.9 Battery SS Completed, FIS Completed, No IA
27INR0245 Pez Rojo BESS 138 217.2 Battery SS Completed, FIS Started, IA
26INR0548 Burnet Bay Storage 138 207.8 Battery SS Completed, FIS Completed, No IA
22INR0558 Callisto II Energy Center 138 203.2 Battery SS Completed, FIS Completed, IA
27INR0436 Coati Energy Storage 138 202.8 Battery SS Completed, FIS Started, No IA
24INR0081 SANJAC BESS 138 202.4 Battery SS Completed, FIS Started, No IA
23INR0382 Outer Loop BESS 345 201.2 Battery SS Completed, FIS Started, No IA
26INR0343 Stinger Energy Storage 138 200.8 Battery SS Completed, FIS Started, No IA
24INR0584 Kegans BESS (Houston IV BESS) 138 164.6 Battery SS Completed, FIS Completed, IA
24INR0419 High Plains Storage 138 157.7 Battery SS Completed, FIS Started, No IA
24INR0196 Dori BQ BESS 138 154 Battery SS Completed, FIS Started, IA
20INR0267 Greens Bayou Expansion n/r 140 Gas Inactive
24INR0073 Hyacinth Storage 345 103.1 Battery SS Completed, FIS Started, No IA
28INR0074 Massey Storage 138 102.9 Battery SS Completed, FIS Completed, No IA
28INR0154 Pamela Heights I 138 101.7 Battery SS Completed, FIS Completed, IA
26INR0317 Pinnacle Point Energy Storage 138 101.3 Battery SS Completed, FIS Completed, No IA
26INR0341 Megamouth Energy Storage 138 101.3 Battery SS Completed, FIS Completed, IA
26INR0590 Callisto ID Energy Center 138 100 Battery SS Completed, FIS Started, No IA
23INR0040 Dori BQ Solar 138 50.4 Solar SS Completed, FIS Started, IA
25INR0002 Barcelona TxHSR TPSS HN-4 138 50 Other SS Completed, FIS Started, No IA
22INR0546 Enchanted Rock NEWPP 138 30 Gas SS Completed, FIS Completed, IA
26INR0345 NET Power Demonstration plant 138 25.5 Gas SS Completed, FIS Completed, No IA
17INR0022 MIRAGE n/r 11 Gas Inactive
24INR0481 Little York BESS 138 10 Battery In Queue

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.