Kegans BESS (Houston IV BESS)
ERCOT queue ID 24INR0584
Kegans BESS (Houston IV BESS) (24INR0584) is listed in the ERCOT interconnection queue as a 164.6 MW battery project in Harris County, TX. The filing names CLODINE as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of September 5, 2026. It records the screening study as complete on October 5, 2023, the full interconnection study as approved on July 1, 2025 and the interconnection agreement as signed on November 7, 2024.
| Queue ID | 24INR0584 |
|---|---|
| Project name | Kegans BESS (Houston IV BESS) |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | CLODINE |
| Point of interconnection | 44140 CLODINE 138kV |
| County | Harris |
| State | TX |
| Voltage | 138 kV |
| Capacity | 164.6 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-09-05 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Harris, TX: 35 requests in the ERCOT queue, 30 active totaling 6,536.2 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | SMT Houston IV LLC |
|---|---|
| CDR reporting zone | HOUSTON |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2024-11-07 |
| Screening study complete | 2023-10-05 |
| Full interconnection study approved | 2025-07-01 |
| Air permit | Not Required |
| Water availability | 2025-09-18 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.