Hobby BESS I
ERCOT queue ID 26INR0546
Hobby BESS I (26INR0546) is listed in the ERCOT interconnection queue as a 602.6 MW battery project in Harris County, TX. The filing names Double Tap Garden Villas – Hall & Garden Villas – Chocolate Bayou as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of October 21, 2028. It records the screening study as complete on December 3, 2024 and the full interconnection study as approved on January 20, 2026.
| Queue ID | 26INR0546 |
|---|---|
| Project name | Hobby BESS I |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | Double Tap Garden Villas – Hall & Garden Villas – Chocolate Bayou |
| Point of interconnection | Double Tap 138kV 42680 Garden Villas – 48250 Hall & 42680 Garden Villas – 48013 Chocolate Bayou |
| County | Harris |
| State | TX |
| Voltage | 138 kV |
| Capacity | 602.6 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-10-21 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Harris, TX: 35 requests in the ERCOT queue, 30 active totaling 6,536.2 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Airport Storage II LLC |
|---|---|
| CDR reporting zone | HOUSTON |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-12-03 |
| Full interconnection study approved | 2026-01-20 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.