NET Power Demonstration plant

ERCOT queue ID 26INR0345

NET Power Demonstration plant (26INR0345) is listed in the ERCOT interconnection queue as a 25.5 MW gas project in Harris County, TX. The filing names Mirage POI 8 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of August 21, 2027. It records the screening study as complete on March 8, 2024 and the full interconnection study as approved on July 10, 2025.

Queue ID26INR0345
Project nameNET Power Demonstration plant
Status (as published)SS Completed, FIS Completed, No IA
SubstationMirage POI 8
Point of interconnection42360 Mirage POI 8 138kV
CountyHarris
StateTX
Voltage138 kV
Capacity25.5 MW
Resource (as published)GAS/GT
Resource categoryGas (normalized for filtering)
Target commercial operation2027-08-21
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Harris, TX: 35 requests in the ERCOT queue, 30 active totaling 6,536.2 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityNET Power LLC
CDR reporting zoneHOUSTON
Fuel codeGAS
Technology codeGT
Screening study complete2024-03-08
Full interconnection study approved2025-07-10

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.