Sigma Storage (23INR0126) is listed in the ERCOT interconnection queue as a 408.4 MW battery project in Harris County, TX. The filing names Deepwater as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 1, 2029. It records the screening study as complete on July 30, 2021.

Queue ID23INR0126
Project nameSigma Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationDeepwater
Point of interconnection40460 Deepwater 138kV
CountyHarris
StateTX
Voltage138 kV
Capacity408.4 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-10-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Deepwater substation: 2 requests in the ERCOT queue, 2 active totaling 817.1 MW.

Queue IDProjectMWResourceStatus
23INR0127Beacon Storage408.7BatterySS Completed, FIS Started, No IA

Harris, TX: 35 requests in the ERCOT queue, 30 active totaling 6,536.2 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityAES Distributed Energy, Inc
CDR reporting zoneHOUSTON
Fuel codeOTH
Technology codeBA
Screening study complete2021-07-30

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first