NRG Greens Bayou 6 (TEF-Due Diligence)
ERCOT queue ID 24INR0410
NRG Greens Bayou 6 (TEF-Due Diligence) (24INR0410) is listed in the ERCOT interconnection queue as a 445 MW gas project in Harris County, TX. The filing names Position 1/0 PSSE , Greens Bayou Substation as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of May 1, 2028. It records the screening study as complete on November 11, 2022, the full interconnection study as approved on August 14, 2025 and the interconnection agreement as signed on February 7, 2025.
| Queue ID | 24INR0410 |
|---|---|
| Project name | NRG Greens Bayou 6 (TEF-Due Diligence) |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Position 1/0 PSSE , Greens Bayou Substation |
| Point of interconnection | Position 1/0 PSSE 40710, Greens Bayou Substation, 138 kV |
| County | Harris |
| State | TX |
| Voltage | 138 kV |
| Capacity | 445 MW |
| Resource (as published) | GAS/GT |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2028-05-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Harris, TX: 35 requests in the ERCOT queue, 30 active totaling 6,536.2 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | NRG Greens Bayou 6 LLC |
|---|---|
| CDR reporting zone | HOUSTON |
| Fuel code | GAS |
| Technology code | GT |
| Interconnection agreement signed | 2025-02-07 |
| Screening study complete | 2022-11-11 |
| Full interconnection study approved | 2025-08-14 |
| Air permit | 2023-09-15 |
| Water availability | 2024-06-26 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.