Furay Battery Energy Storage System
ERCOT queue ID 24INR0413
Furay Battery Energy Storage System (24INR0413) is listed in the ERCOT interconnection queue as a 304 MW battery project in Harris County, TX. The filing names Tap Jonte substation – Scenic Woods Tapping both radial lines. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 30, 2028. It records the screening study as complete on November 29, 2022.
| Queue ID | 24INR0413 |
|---|---|
| Project name | Furay Battery Energy Storage System |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Jonte substation – Scenic Woods Tapping both radial lines. |
| Point of interconnection | Tap 138kV 45660 Jonte substation – 46332 Scenic Woods Tapping both radial lines. |
| County | Harris |
| State | TX |
| Voltage | 138 kV |
| Capacity | 304 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-09-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Harris, TX: 35 requests in the ERCOT queue, 30 active totaling 6,536.2 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Blue Topaz 1, LLC |
|---|---|
| CDR reporting zone | HOUSTON |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2022-11-29 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.