Claire BESS (24INR0500) is listed in the ERCOT interconnection queue as a 406 MW battery project in Harris County, TX. The filing names Cedar Bayou as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 17, 2027. It records the screening study as complete on May 8, 2023.

Queue ID24INR0500
Project nameClaire BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationCedar Bayou
Point of interconnection40011 Cedar Bayou 138kV
CountyHarris
StateTX
Voltage138 kV
Capacity406 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-12-17
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Cedar Bayou substation: 2 requests in the ERCOT queue, 2 active totaling 1,103 MW.

Queue IDProjectMWResourceStatus
23INR0029Cedar Bayou 5 (TEF - Due Diligence)697GasSS Completed, FIS Completed, IA

Harris, TX: 35 requests in the ERCOT queue, 30 active totaling 6,536.2 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBRP Blue Topaz 3, LLC
CDR reporting zoneHOUSTON
Fuel codeOTH
Technology codeBA
Screening study complete2023-05-08

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.