Cameron, TX interconnection queue

29 active projects totalling 6,081.9 MW in the ERCOT queue.

29active projects
6,081.9active MW
29total filed
Queue IDProjectkVMWResourceStatus
27INR0084 Aegle Power 345 1,536.4 Gas SS Completed, FIS Started, No IA
22INR0480 Pachanga Wind 345 300 Wind SS Completed, FIS Started, No IA
22INR0401 Eval Storage 138 251.9 Battery SS Completed, FIS Started, IA
26INR0008 Puerto Del Sol 1 345 213.8 Solar SS Completed, FIS Started, No IA
27INR0002 Puerto Del Sol 2 345 213.8 Solar SS Completed, FIS Started, No IA
24INR0381 Alexandrite Storage 138 203 Battery SS Completed, FIS Started, No IA
28INR0427 Ouroboros Grid BESS 4 345 201.1 Battery SS Completed, FIS Started, No IA
28INR0428 Ouroboros Grid BESS 5 345 201 Battery SS Completed, FIS Started, No IA
28INR0429 Ouroboros Grid BESS 6 345 200.9 Battery SS Completed, FIS Started, No IA
28INR0397 Ouroboros Grid BESS 1 345 200.8 Battery SS Completed, FIS Started, No IA
28INR0398 Ouroboros Grid BESS 2 345 200.8 Battery SS Completed, FIS Started, No IA
25INR0385 Bobcat Cameron BESS 138 200.8 Battery SS Completed, FIS Started, No IA
26INR0461 Rio Hondo BESS 138 200.8 Battery SS Completed, FIS Started, No IA
28INR0403 Ouroboros Grid BESS 3 345 200.7 Battery SS Completed, FIS Started, No IA
27INR0399 Resaca Oasis Storage 138 200.7 Battery SS Completed, FIS Completed, IA
23INR0066 Accalia Point Solar 345 190.5 Solar SS Completed, FIS Started, No IA
25INR0270 Harryoung Solar 138 190 Solar SS Completed, FIS Started, No IA
25INR0552 HarryoungBESS 138 190 Battery SS Completed, FIS Started, No IA
24INR0306 Arroyo Storage 345 183.8 Battery SS Completed, FIS Completed, IA
26INR0640 Amberjack2 BESS 345 180 Battery SS Completed, FIS Started, No IA
24INR0572 Megacharge BESS 69 110 Battery SS Completed, FIS Started, No IA
24INR0294 Citrus Flatts BESS 138 103 Battery SS Completed, FIS Completed, IA
26INR0181 Solar Star Frontier BESS 138 101 Battery SS Completed, FIS Started, No IA
20INR0086 Arroyo Solar 345 100 Solar SS Completed, FIS Started, IA
22INR0469 Harper Energy Storage 138 82.4 Battery SS Completed, FIS Started, No IA
26INR0515 Rio Grand Valley Element Fuels Power 138 79.6 Hydro SS Completed, FIS Started, No IA
24INR0319 Burro Loco Energy Storage 69 25.1 Battery SS Completed, FIS Started, No IA
25INR0766 Mesquite BESS2 12.5 10 Battery In Queue
26INR0691 Harlingen #1 BESS 1 69 10 Battery In Queue

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.