Solar Star Frontier BESS (26INR0181) is listed in the ERCOT interconnection queue as a 101 MW battery project in Cameron County, TX. The filing names Luna as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of February 27, 2029. It records the screening study as complete on September 22, 2023.

Queue ID26INR0181
Project nameSolar Star Frontier BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationLuna
Point of interconnection8656 Luna 138kV
CountyCameron
StateTX
Voltage138 kV
Capacity101 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-02-27
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entitySolar Star Frontier BESS, LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2023-09-22
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first