Substation Scout

Ouroboros Grid BESS 5

ERCOT queue ID 28INR0428

Ouroboros Grid BESS 5 (28INR0428) is listed in the ERCOT interconnection queue as a 201 MW battery project in Cameron County, TX. The filing names Palmito as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 1, 2029. It records the screening study as complete on November 21, 2025.

Queue ID28INR0428
Project nameOuroboros Grid BESS 5
Status (as published)SS Completed, FIS Started, No IA
SubstationPalmito
Point of interconnection79500 Palmito 345KV
CountyCameron
StateTX
Voltage345 kV
Capacity201 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-06-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Palmito substation: 3 requests in the ERCOT queue, 3 active totaling 603 MW.

Queue IDProjectMWResourceStatus
28INR0427Ouroboros Grid BESS 4201.1BatterySS Completed, FIS Started, No IA
28INR0429Ouroboros Grid BESS 6200.9BatterySS Completed, FIS Started, No IA

Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityOuroboros Grid BESS Unit 5
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2025-11-21

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first