Rio Grand Valley Element Fuels Power

ERCOT queue ID 26INR0515

Rio Grand Valley Element Fuels Power (26INR0515) is listed in the ERCOT interconnection queue as a 79.6 MW hydro project in Cameron County, TX. The filing names Tap Waterport Substation - Southmost Sub as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 5, 2028. It records the screening study as complete on September 10, 2024.

Queue ID26INR0515
Project nameRio Grand Valley Element Fuels Power
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Waterport Substation - Southmost Sub
Point of interconnectionTap 138kV 59450 Waterport Substation - 5789 Southmost Sub
CountyCameron
StateTX
Voltage138 kV
Capacity79.6 MW
Resource (as published)HYD/OT
Resource categoryHydro (normalized for filtering)
Target commercial operation2028-12-05
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityElement H2Gen, LLC
CDR reporting zoneCOASTAL
Fuel codeHYD
Technology codeOT
Screening study complete2024-09-10

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.