Rio Grand Valley Element Fuels Power
ERCOT queue ID 26INR0515
Rio Grand Valley Element Fuels Power (26INR0515) is listed in the ERCOT interconnection queue as a 79.6 MW hydro project in Cameron County, TX. The filing names Tap Waterport Substation - Southmost Sub as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 5, 2028. It records the screening study as complete on September 10, 2024.
| Queue ID | 26INR0515 |
|---|---|
| Project name | Rio Grand Valley Element Fuels Power |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Waterport Substation - Southmost Sub |
| Point of interconnection | Tap 138kV 59450 Waterport Substation - 5789 Southmost Sub |
| County | Cameron |
| State | TX |
| Voltage | 138 kV |
| Capacity | 79.6 MW |
| Resource (as published) | HYD/OT |
| Resource category | Hydro (normalized for filtering) |
| Target commercial operation | 2028-12-05 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Element H2Gen, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | HYD |
| Technology code | OT |
| Screening study complete | 2024-09-10 |