Ouroboros Grid BESS 1 (28INR0397) is listed in the ERCOT interconnection queue as a 200.8 MW battery project in Cameron County, TX. The filing names POIB: # Chalybe (expansion of the # Chalybe – to be connected by double circuit line to # Palmito ) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 1, 2028. It records the screening study as complete on October 22, 2025.

Queue ID28INR0397
Project nameOuroboros Grid BESS 1
Status (as published)SS Completed, FIS Started, No IA
SubstationPOIB: # Chalybe (expansion of the # Chalybe – to be connected by double circuit line to # Palmito )
Point of interconnectionPOIB: #88337 Chalybe 345 kV (expansion of the #8735 Chalybe 138 kV – to be connected by double circuit line to #79500 Palmito 345 kV)
CountyCameron
StateTX
Voltage345 kV
Capacity200.8 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-06-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityOuroboros Grid BESS Unit 1
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2025-10-22

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first