Rio Hondo BESS
ERCOT queue ID 26INR0461
Rio Hondo BESS (26INR0461) is listed in the ERCOT interconnection queue as a 200.8 MW battery project in Cameron County, TX. The filing names Tap # Las Pulgas - # Rio Hondo as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 30, 2028. It records the screening study as complete on August 5, 2024.
| Queue ID | 26INR0461 |
|---|---|
| Project name | Rio Hondo BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap # Las Pulgas - # Rio Hondo |
| Point of interconnection | Tap 138kV #80309 Las Pulgas - #8319 Rio Hondo |
| County | Cameron |
| State | TX |
| Voltage | 138 kV |
| Capacity | 200.8 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-06-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | SBESS TX25 LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-08-05 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.