Rattler Combined Cycle Energy Center II
ERCOT queue ID 29INR0415
Rattler Combined Cycle Energy Center II (29INR0415) is listed in the ERCOT interconnection queue as a 990.6 MW gas project in Cameron County, TX. The filing names RIOHONDO7A Substation as its point of interconnection. ERCOT lists its status as “SS Started, FIS Started, No IA”, with a target commercial operation date of May 15, 2029.
| Queue ID | 29INR0415 |
|---|---|
| Project name | Rattler Combined Cycle Energy Center II |
| Status (as published) | SS Started, FIS Started, No IA |
| Substation | RIOHONDO7A Substation |
| Point of interconnection | 345kV 8318 RIOHONDO7A Substation |
| County | Cameron |
| State | TX |
| Voltage | 345 kV |
| Capacity | 990.6 MW |
| Resource (as published) | GAS/CC |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2029-05-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
RIOHONDO7A Substation substation: 3 requests in the ERCOT queue, 3 active totaling 2,971.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 29INR0410 | Rattler Combined Cycle Energy Center I | 990.6 | Gas | SS Started, FIS Started, No IA |
| 29INR0416 | Rattler Combined Cycle Energy Center III | 990.6 | Gas | SS Started, FIS Started, No IA |
Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | New request | 990.6 | Not reported → SS Started, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Black Mountain Energy Storage II |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | GAS |
| Technology code | CC |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.