Aegle Power

ERCOT queue ID 27INR0084

Aegle Power (27INR0084) is listed in the ERCOT interconnection queue as a 1,536.4 MW gas project in Cameron County, TX. The filing names (#) Kingfisher as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 30, 2027. It records the screening study as complete on October 17, 2024.

Queue ID27INR0084
Project nameAegle Power
Status (as published)SS Completed, FIS Started, No IA
Substation(#) Kingfisher
Point of interconnection(#79501) Kingfisher 345 kV
CountyCameron
StateTX
Voltage345 kV
Capacity1,536.4 MW
Resource (as published)GAS/CC
Resource categoryGas (normalized for filtering)
Target commercial operation2027-07-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityAegle Power LLC
CDR reporting zoneCOASTAL
Fuel codeGAS
Technology codeCC
Screening study complete2024-10-17

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.