Substation Scout

Mesquite BESS2

ERCOT queue ID 25INR0766

Mesquite BESS2 (25INR0766) is listed in the ERCOT interconnection queue as a 10 MW battery project in Cameron County, TX. The filing names New DESR on the coordinates above tie at to: TSP Station Name: Mesquite TSP as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of August 31, 2026. It records the interconnection agreement as signed on May 23, 2024.

Queue ID25INR0766
Project nameMesquite BESS2
Status (as published)In Queue
SubstationNew DESR on the coordinates above tie at to: TSP Station Name: Mesquite TSP
Point of interconnectionNew DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Mesquite TSP Station Code: MESQUITE Load Name: LOAD2 Bus #: PTI Bus Number: 8554 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: #2
CountyCameron
StateTX
Voltage12.5 kV
Capacity10 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2026-08-31
Source datasetsmall

Same substation and county

Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMesquite Clean Energy Center, LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-05-23

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first