Harlingen #1 BESS 1

ERCOT queue ID 26INR0691

Harlingen #1 BESS 1 (26INR0691) is listed in the ERCOT interconnection queue as a 10 MW battery project in Cameron County, TX. The filing names TSP Station Name: Harlingen #1 TSP as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of August 21, 2026. It records the interconnection agreement as signed on June 18, 2025.

Queue ID26INR0691
Project nameHarlingen #1 BESS 1
Status (as published)In Queue
SubstationTSP Station Name: Harlingen #1 TSP
Point of interconnectionTSP Station Name: Harlingen #1 TSP Station Code: HARLIN_1 • Load Name / Load Transformer Name: 69_12_1 Bus #: PTI Bus Number:8321 Voltage (Transmission level kV):69kV Node (associated w/ load/load XFMR in NMMS): Transformer 1
CountyCameron
StateTX
Voltage69 kV
Capacity10 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2026-08-21
Source datasetsmall

Same substation and county

Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHarlingen ESS Assets LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2025-06-18

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.