HarryoungBESS
ERCOT queue ID 25INR0552
HarryoungBESS (25INR0552) is listed in the ERCOT interconnection queue as a 190 MW battery project in Cameron County, TX. The filing names Rio Hondo sub as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 15, 2028. It records the screening study as complete on December 19, 2023.
| Queue ID | 25INR0552 |
|---|---|
| Project name | HarryoungBESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Rio Hondo sub |
| Point of interconnection | 8319 Rio Hondo sub 138kV |
| County | Cameron |
| State | TX |
| Voltage | 138 kV |
| Capacity | 190 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-05-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Gransolar Texas Four LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2023-12-19 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.