Harryoung Solar

ERCOT queue ID 25INR0270

Harryoung Solar (25INR0270) is listed in the ERCOT interconnection queue as a 190 MW solar project in Cameron County, TX. The filing names Tap Rio Hondo - SOUTH SANTA ROSA as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 15, 2028. It records the screening study as complete on February 17, 2023.

Queue ID25INR0270
Project nameHarryoung Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Rio Hondo - SOUTH SANTA ROSA
Point of interconnectionTap 8319 Rio Hondo - SOUTH SANTA ROSA: 8359, 138kV
CountyCameron
StateTX
Voltage138 kV
Capacity190 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-05-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGransolar Texas Four LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Screening study complete2023-02-17
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.